DownLoad
Size:30.4MB
Down:次
Hobi 2.1.7
- Systems:Android
- Classify :Multimedia
- File size:30.4MB
- Developer: Hobi
- Down:
- Time:2024-04-27 04:51:49
#Hobi 2.1.7 Review
#Hobi 2.1.7 Introduction
If you are a TV series fan, you probably know how complicated it can be following all the series you like and keeping up with the dates of new episodes, the premiere of the new seasons, and all current events around them. That is why downloading an application like Hobi makes sense.
Hobi 2.1.7 Follow all the TV shows you like
The application lets users keep track of their favorite TV series. To follow your favorite series, all you have to do is choose from the main menu those which are your favorites, such as Game of Thrones, Breaking Bad, Silicon Valley, Stranger Things, and more. Then, in your personalized menu, you will be able to see the number of seasons, the number of episodes, or their broadcast dates. If the series is still in progress, you can find out when the next episode will be released.
But its features are not limited to that, it also offers suggestions based on the user's likes as well as other services and functions such as the following:
Discover new television series.
Countdown to the next episode emission.
Get notified so you do not miss any release dates.
Integration with Track.TV.
Customized series manager.
Possibility of making notes on each episode and rating it.
Detailed information on each series: general overview of the series and episode.
Hobi 2.1.7 Requirements and additional information:
Minimum operating system requirements: Android 5.0.
Offers in-app purchases.
Instructions to install XAPKs on Android
Hobi 2.1.7 NewS
With Hobi for Android devices, you can follow your favorite TV series and keep up to date with their broadcasting without missing their new episodes









